top of page

Different Types of Party Wall Notices



When it comes to construction or renovation projects that involve shared property boundaries, Party Wall Notices play a pivotal role in legalizing and regulating the work. These notices are formal notifications sent to neighbors affected by the project, informing them of the intended work and seeking their consent or acknowledgment. In this comprehensive guide, we will explore various types of Party Wall Notices, the situations in which they are required, and the crucial distinctions between them.


Party Wall Notice (Section 1 Notice)


A Party Wall Notice, also known as a Section 1 Notice, is the fundamental notice required under the Party Wall Act 1996 in the United Kingdom. This notice is typically used in situations where a property owner intends to carry out construction work that affects a shared wall or boundary with an adjacent property. Key points about the Section 1 Notice include:


When It's Required: Whenever a property owner plans to build on or near a boundary that they share with another property, a Section 1 Notice must be served to notify the neighboring owner of the intended work.


Contents: The notice should provide a detailed description of the proposed work, including drawings and plans, the anticipated start date, and any specific requirements related to the Party Wall Act.


Response Time: Upon receiving the notice, the neighboring owner has 14 days to respond. They can either consent to the work or dissent, triggering the need for a Party Wall Agreement.


Notice of Adjacent Excavation (Section 6 Notice)


A Notice of Adjacent Excavation, also known as a Section 6 Notice, is specifically required when a property owner intends to excavate near the boundary line, and the excavation will extend below the level of the neighboring owner's foundation. This notice is crucial to prevent potential damage to the adjacent property and to establish the necessary safeguards. Key points about the Section 6 Notice include:


When It's Required: A Section 6 Notice is necessary when excavation work near a shared boundary involves digging deeper than the neighboring property's foundation or within a certain distance specified by the Party Wall Act.


Contents: Similar to the Section 1 Notice, the Section 6 Notice should contain detailed plans, drawings, and specifications of the excavation work, along with the anticipated start date and any relevant instructions.


Response Time: The neighboring owner has 14 days to respond to the notice. If they consent, the property owner can proceed with the excavation under certain conditions. If there are concerns, a Party Wall Agreement may be required.


Line of Junction Notice (Section 11 Notice)


The Line of Junction Notice, or Section 11 Notice, is used when a property owner plans to build a new wall on or astride the boundary line shared with a neighboring property. This notice essentially seeks permission to place the wall on the boundary itself. Key points about the Section 11 Notice include:


When It's Required: A Line of Junction Notice is required when a property owner intends to erect a new wall exactly on the boundary between their property and the neighboring property.


Contents: This notice should include detailed plans and drawings of the proposed wall, along with specifications and the anticipated start date. It should also outline the owner's intentions regarding the wall, such as its ownership and maintenance.


Response Time: As with other Party Wall Notices, the neighboring owner has 14 days to respond. If they agree to the Line of Junction, it is essential to formalize these arrangements in a Party Wall Agreement.


Party Structure Notice (Section 3 Notice)


A Party Structure Notice, or Section 3 Notice, is used when a property owner plans to carry out work solely on their property but in a way that might affect an existing party wall or structure. Unlike the Section 1 Notice, this notice pertains to work that is not directly on the boundary but may still have an impact on the neighboring property. Key points about the Section 3 Notice include:


When It's Required: A Section 3 Notice is necessary when a property owner intends to work on their property in a manner that could affect an existing party wall, floor, or other structure shared with a neighboring property.


Contents: The notice should outline the nature of the proposed work, its potential impact on the party structure, and any necessary precautions or measures to mitigate potential damage.


Response Time: Similar to other Party Wall Notices, the neighboring owner has 14 days to respond. If they agree to the proposed work, it is crucial to document these agreements in a Party Wall Agreement.


Understanding the different types of Party Wall Notices and when they are required is essential for property owners and construction professionals involved in projects that impact shared boundaries or party structures. Adhering to the Party Wall Act and serving the appropriate notice to neighbors ensures legal compliance and helps prevent disputes during construction or renovation projects. Property owners should consult with experienced Party Wall Surveyors to navigate the complex regulations surrounding Party Wall Notices and agreements successfully.


For more information you can call us at 020 3633 0823 or contact us

8 views0 comments

Comments